



Product Features/
Water-based environmental protection
National standard color
Good covering power
Large spraying area
Fast drying time
Can be diluted with water 10-20%.
Construction Process/
1. It can be constructed by brushing or spraying, adding water to dilute it appropriately, please don’t add too much water.
2. The surface of the object to be painted should be clean, without oil, floating ash, rust spots, etc..
3. When painting, if there is a drying line, in order to accelerate the drying of the paint film, can be dried at 90 ℃, and make the leveling time of not less than 15 minutes, drying time of not less than 25 minutes.
4. During construction, it is forbidden to mix with other paints and organic solvents to prevent deterioration, and at the end of construction, the apparatus used should be rinsed with water immediately to prevent drying.
Notice/
1. Dilute with water to avoid acidity, and follow the principle of small amount and many times when diluting.
2. The leftover paint should be stored separately, and the PH value should be maintained at 7.5-8.5 when it is used again.
3. It is not suitable for construction when the temperature is lower than 5℃ or the humidity is higher than 85%.
Storage and Transportation/
1.The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature:5-35℃.
2.Protect from cold, sunlight and rain during transportation.